Liberal, KS

Now: 71 °

Currently: Clouds

Hi: 89 ° | Lo: 70 °

USD 480 Picks General Design for Schools

KSCB News - June 24, 2014 6:14 am

The USD 480 school board met Monday night for their regularly scheduled meeting. The board approved a schematic design for the construction of Liberal’s future schools. They will use designs from prototypes of other buildings which DLR Architectuve has already designed. This will save the district architectural costs. There will be more detail added inside but this is just the general scheme of the building which the board approved. The elemantary prototypes are similar to buildings being constructed in North Little Rock, Arkansas. The board also approved an architect’s contract for DLR. DLR is reducing architectural fees on the project because the district is using designs the firm has already developed.

 

Latest Stories

Turpin Man Attacked by Pack of Dogs

Early Thursday morning, July 18, shortly after midnight, a 23-year-old man was attacked by a pack...

New SCCC instructor recruiting for Saints Pep Band

by Rachel Coleman LIBERAL, Kan. — Claire Thompson started college with the goal of becoming a...

The Sandlot in Liberal this Friday

Victor DiMatti and Shane Obedzinski, “Timmy and Tommy Timmons”, Grant Gelt “Bertram” and Brandon Adams, “DeNunez”,...

 
KSCB Radio News